Torbay Solar

Local Authorities • Torbay

Torbay is aiming to generate 5 MW of solar energy and work towards carbon neutrality by 2030.

  • Planned solar farm.
  • Our proposed solar park and recreation park.
  • Solar farm.

Our story

Torbay Council and the Torbay Development Agency are developing two ground mounted solar farms, one at Brokenbury (2 Mega Watts (MW)), in Churston, Brixham and one at Nightingale park, Torquay (3.2MW). The Council has agreed to spend just under £5m to fund the construction and delivery of these solar farms which will provide renewable energy directly to South West Water and Torbay Hospital.

Both farms have undergone extensive public consultation as part of the planning process. Planning consent has been obtained for Brokenbury solar farm (in April 2025) and the Nightingale park site has been prepared and the project is ready to procure a contractor.

It is estimated that the schemes will save just under 30,000 tonnes of carbon over their lifetime and help increase local renewable energy generation.

Currently renewable energy production in Torbay is limited, and mainly from small roof mounted solar photovoltaic panels which provide just 1.6% of Torbay's current electricity consumption. These proposed solar schemes will generate over 5 megawatts of clean electricity through ground mounted solar arrays. It is proposed that the energy generated will be used directly on site by South West Water and Torbay Hospital, with any surpluses fed to the National Grid. Such a scheme will increase the amount of clean renewable energy generated and consumed locally and help Torbay work towards becoming carbon neutral by 2030.

The schemes are being developed by Torbay Development Agency and funded by Torbay Council. Energy will be sold to South West Water and Torbay Hospital.

Our advice

Unless an organisation has carried out a solar development of any size before and is aware of the number of different consents, timescales involved and costs, thorough due diligence is recommended.

The planning process, grid connection and legal agreements (in this case Power Purchase Agreements through private wire connections) have the potential to delay the programme and add capital costs. Its important to get the right consultant support and preferable a consultant that has the expertise to assist through the many different phases from feasibility at the start to installation completion (although this may not exist the point being that continuity in the project team is desirable).

Our Changeprint

Our Changeprint can be measured by the amount of local renewable energy generated in kilo watt hours (kWh); amount of carbon emissions saved (approx 30,000 tonnes); additional well-paid local jobs created in the design, construction and maintenance of the solar parks; and by providing a resilient local energy network fit for the future.

Feeling inspired? Discover more about this story...

Location

Torbay

Reach

Area

Sector

Local Authorities

Shared by

South West Net Zero Hub

Updated Oct, 2025

Recommended for you

  • Power Up North London
    Greater London

    Power Up North London

    Delivering locally-owned renewable energy solutions enabling communities to mitigate climate change.

    Renewable Energy
  • Slieve Kirk Community Fund
    Causeway Coast and Glens

    Slieve Kirk Community Fund

    Supporting community initiatives with funds from Northern Ireland's largest windfarm.

    Renewable Energy
  • South East London Community Energy
    Greater London

    South East London Community Energy

    Providing Londoners in the south east with access to affordable, renewable energy.

    Renewable Energy
  • Community Energy Together
    Wales

    Community Energy Together

    Transferring seven operational solar farms into community ownership.

    Renewable Energy